• What are we doing?

     

    The delivery of the iCore solution is split into two elements:

    Element 1 focuses on design, development and manufacture of a keyhole located and operated pipe installation system that will install PE pipes in the size range of 25mm through to 90mm. Specifically a range of Long Handle Tooling is being developed to install and remove a service connections as required.

    iCore-elements-350x475.png

    Element 2  includes design, development and manufacture of a mains replacement insertion system for live or dead insertion of pipes (63mm through to 180mm diameter) inside existing metallic pipes from a 600mm diameter cored keyhole excavation.

    (click here for a larger version of this diagram)

     iCore-timeline-150x475.png

    (click here for a larger version of this diagram)

    'iCore will provide a one stop keyhole solution, for mains and service replacement activities.'